What is included in a package?
A typical package includes a powder-coated aluminium shopfront with toughened or laminated glazing, a single or double entrance door with level access where possible, a fascia with a built-in shutter box, and an electric shutter with perforated, vision or solid laths. Signage is usually handled separately and may need advertisement consent.
How does planning work for a new shopfront?
Replacing a shopfront and adding an external shutter usually needs planning permission, and listed buildings need listed building consent. We provide the shopfront and shutter specification for the application and design to your council's shopfront guidance where it exists. Read our planning guide.
What's included
- Shopfront, doors, fascia and shutter designed as one
- Powder-coated aluminium frames in any RAL colour
- Toughened or laminated safety glazing
- Shutter box built into the fascia
- Electric shutter with manual override
- Level-access entrance options
- Specification for your planning application
- One quote, one programme
Specification at a glance
| Frame | Powder-coated aluminium |
|---|---|
| Glass | Toughened or laminated |
| Doors | Single or double, level access options |
| Shutter | Integrated electric |
| Planning | Specification supplied for your application |
How much do shopfront and shutter packages cost?
| Option | Guide price ex VAT | Inc VAT |
|---|---|---|
| Double frontage with two integrated shutters | £11,995–£14,995 | £14,394–£17,994 |
| Single shopfront with integrated electric shutter Recommended | £6,995–£10,995 | £8,394–£13,194 |
| Shutter added to an existing shopfront, box hidden behind fascia | £1,995–£3,495 | £2,394–£4,194 |
Guide prices, supply and fit, for a typical shopfront about 3 m × 2.5 m unless stated. Your fixed price is confirmed in writing after a free survey, before any work starts.
See every option on our price guide, or use the guide-price tool with your own measurements.
Questions shop owners ask
How long does a new shopfront take?
After survey, design and any planning approval, manufacture usually takes a few weeks and installation a few days. We give you a programme in writing with the quote.
Can you keep my shop trading during the work?
Often, with temporary boarding or a phased installation. We plan this with you before work starts.
Do you do the signage too?
We can coordinate signage, but signs often need separate advertisement consent and are quoted separately.
Can I reuse my existing shutter?
Sometimes, if it is in good condition and suits the new layout. We assess it at survey.