Shopfronts in March and shopfront and shutter packages
Where a shop opens onto a busy pavement, safety during fitting and in daily use matters. We cordon the work area, fix guides into sound masonry or steel, and set electric controls so the person operating the shutter can see the curtain while it moves.
If your shop in March already has a shutter, we will tell you honestly whether a repair, a new motor, a conversion or a full replacement makes most sense before you spend anything.
Our coverage around March takes in Wisbech, Ely, Peterborough and the wider Cambridgeshire area.

Shopfront & shutter packages: what you get
A new aluminium shopfront designed around an integrated shutter.
- One quote, one programme
- Electric shutter with manual override
- Specification for your planning application
- Toughened or laminated safety glazing
| Glass | Toughened or laminated |
|---|---|
| Doors | Single or double, level access options |
| Shutter | Integrated electric |
More detail on our shopfront and shutter packages page.
Guide prices
| Option | Guide price ex VAT | Inc VAT |
|---|---|---|
| Double frontage with two integrated shutters | £11,995–£14,995 | £14,394–£17,994 |
| Single shopfront with integrated electric shutter Recommended | £6,995–£10,995 | £8,394–£13,194 |
| Shutter added to an existing shopfront, box hidden behind fascia | £1,995–£3,495 | £2,394–£4,194 |
Guide prices, supply and fit, for a typical shopfront about 3 m × 2.5 m unless stated. Your fixed price is confirmed in writing after a free survey, before any work starts.
Consents for shopfronts in March
In England, an external shutter on a shopfront is normally treated as development that needs planning permission from your local planning authority, because it changes how the building looks. There is no permitted development right for shop shutters. Internal shutters fitted behind the glass usually sit outside planning control.
Listed buildings need listed building consent for works affecting their character, inside or out, and conservation areas bring closer scrutiny of the design. Many councils publish a shopfront design guide that prefers perforated, punched or internal shutters with the box hidden behind the fascia.
Four steps to a new shutter
Get in touch
Give us the postcode and what you are after. We confirm a survey slot and anything we need beforehand.
Survey on site
A surveyor measures up, photographs the frontage and checks headroom, side room and the ground the shutter closes onto.
Fixed written quote
You receive a written quote with the specification, programme and a fixed price. Nothing is ordered until you accept.
Fit and test
After fitting we test every function with you and confirm servicing recommendations in writing.
Common questions
Do you cover March?
Yes. We cover March and the PE15 area, as well as Wisbech and Ely. Book through the form, freephone 0800 088 6248 or live chat.
Will I need planning permission for a shutter in March?
An external shutter normally needs planning permission from the local planning authority, while internal shutters behind the glass usually do not. Listed buildings and conservation areas need extra care. We provide the shutter specification for your application.
How long does a new shopfront take?
After survey, design and any planning approval, manufacture usually takes a few weeks and installation a few days. We give you a programme in writing with the quote.
Can you keep my shop trading during the work?
Often, with temporary boarding or a phased installation. We plan this with you before work starts.