Planning shopfront and shutter packages in Grays
For landlords with several units in Grays, we can survey a whole parade in one visit and quote shutters that match across every shop, which helps planning applications and keeps the frontage consistent.
Each shutter is made to measure before the fitting visit, so most single shopfronts in Grays are fitted in one day once planning and landlord consent are in place. We plan the visit around your trading hours where we can.
We also cover South Ockendon, Gravesend and Dartford, and the rest of Essex.

What's included
A new aluminium shopfront designed around an integrated shutter.
- One quote, one programme
- Shutter box built into the fascia
- Level-access entrance options
- Shopfront, doors, fascia and shutter designed as one
| Doors | Single or double, level access options |
|---|---|
| Planning | Specification supplied for your application |
| Frame | Powder-coated aluminium |
More detail on our shopfront and shutter packages page.
Guide prices
| Option | Guide price ex VAT | Inc VAT |
|---|---|---|
| Double frontage with two integrated shutters | £11,995–£14,995 | £14,394–£17,994 |
| Single shopfront with integrated electric shutter Recommended | £6,995–£10,995 | £8,394–£13,194 |
| Shutter added to an existing shopfront, box hidden behind fascia | £1,995–£3,495 | £2,394–£4,194 |
Guide prices, supply and fit, for a typical shopfront about 3 m × 2.5 m unless stated. Your fixed price is confirmed in writing after a free survey, before any work starts.
Consents for shopfronts in Grays
English councils generally expect a planning application before an external roller shutter goes on a shopfront, since the shutter alters the appearance of the building; shop shutters have no permitted development right. A shutter installed inside, behind the glazing, does not usually need permission.
If the building is listed, listed building consent is needed as well, and in a conservation area the council will look harder at the curtain type, box position and colour. A council shopfront guide, where one exists, is the best place to start.
Four steps to a new shutter
Send your details
Use the form, freephone or chat to tell us what you need. A short description and a photo help us bring the right information to the survey.
Measure and check
We confirm sizes, fixings and power on site, and note anything that affects planning or the box position.
Quote in writing
We send the specification and a fixed price in writing, with a deposit only on acceptance.
Made, fitted, explained
The shutter is made to measure and fitted, then we show you how to use it and the manual override, and leave the paperwork.
Shopfront & shutter packages in Grays: questions
Will I need planning permission for a shutter in Grays?
An external shutter normally needs planning permission from the local planning authority, while internal shutters behind the glass usually do not. Listed buildings and conservation areas need extra care. We provide the shutter specification for your application.
Can you match my Grays shopfront's colour?
Yes. Laths, box and guides can be powder coated to a RAL colour so the shutter matches your shopfront frame or fascia, which councils often prefer.
How long does a new shopfront take?
After survey, design and any planning approval, manufacture usually takes a few weeks and installation a few days. We give you a programme in writing with the quote.
Do you do the signage too?
We can coordinate signage, but signs often need separate advertisement consent and are quoted separately.