Shopfront & shutter packages for shops in Andover
For landlords with several units in Andover, we can survey a whole parade in one visit and quote shutters that match across every shop, which helps planning applications and keeps the frontage consistent.
Before quoting in Andover, we confirm who owns the frontage, whether the lease restricts external alterations and whether the building is listed or in a conservation area. Sorting that early avoids paying for something that cannot be fitted.
From Andover our coverage runs out to Winchester, Newbury and Salisbury, with islands and remote areas by arrangement.

What's included
A new aluminium shopfront designed around an integrated shutter.
- Electric shutter with manual override
- Shutter box built into the fascia
- Powder-coated aluminium frames in any RAL colour
- One quote, one programme
| Doors | Single or double, level access options |
|---|---|
| Shutter | Integrated electric |
| Glass | Toughened or laminated |
More detail on our shopfront and shutter packages page.
Prices for shopfront and shutter packages in Andover
| Option | Guide price ex VAT | Inc VAT |
|---|---|---|
| Double frontage with two integrated shutters | £11,995–£14,995 | £14,394–£17,994 |
| Single shopfront with integrated electric shutter Recommended | £6,995–£10,995 | £8,394–£13,194 |
| Shutter added to an existing shopfront, box hidden behind fascia | £1,995–£3,495 | £2,394–£4,194 |
Guide prices, supply and fit, for a typical shopfront about 3 m × 2.5 m unless stated. Your fixed price is confirmed in writing after a free survey, before any work starts.
Planning and listed buildings in Andover
In England, an external shutter on a shopfront is normally treated as development that needs planning permission from your local planning authority, because it changes how the building looks. There is no permitted development right for shop shutters. Internal shutters fitted behind the glass usually sit outside planning control.
Listed buildings need listed building consent for works affecting their character, inside or out, and conservation areas bring closer scrutiny of the design. Many councils publish a shopfront design guide that prefers perforated, punched or internal shutters with the box hidden behind the fascia.
Four steps to a new shutter
Send your details
Use the form, freephone or chat to tell us what you need. A short description and a photo help us bring the right information to the survey.
Survey on site
A surveyor measures up, photographs the frontage and checks headroom, side room and the ground the shutter closes onto.
Fixed written quote
You receive a written quote with the specification, programme and a fixed price. Nothing is ordered until you accept.
Fit and test
After fitting we test every function with you and confirm servicing recommendations in writing.
Questions from shop owners in Andover
Do you repair shutters in Andover that you didn't fit?
Yes. We repair and service most makes of shop shutter, motor and control in Andover. If parts are no longer made, we explain the options in writing.
Can you match my Andover shopfront's colour?
Yes. Laths, box and guides can be powder coated to a RAL colour so the shutter matches your shopfront frame or fascia, which councils often prefer.
How long does a new shopfront take?
After survey, design and any planning approval, manufacture usually takes a few weeks and installation a few days. We give you a programme in writing with the quote.
Can you keep my shop trading during the work?
Often, with temporary boarding or a phased installation. We plan this with you before work starts.