Planning shopfront and shutter packages in Deal
Shops in the CT14 postcode district range from convenience stores to takeaways, salons and specialist retailers. We tailor shopfront and shutter packages to the stock you hold and the hours you open, and say plainly where a different option would serve you better.
Before quoting in Deal, we confirm who owns the frontage, whether the lease restricts external alterations and whether the building is listed or in a conservation area. Sorting that early avoids paying for something that cannot be fitted.
Our coverage around Deal takes in Dover, Ramsgate, Broadstairs and the wider Kent area.

What our shopfront and shutter packages include
A new aluminium shopfront designed around an integrated shutter.
- Shutter box built into the fascia
- One quote, one programme
- Specification for your planning application
- Shopfront, doors, fascia and shutter designed as one
| Doors | Single or double, level access options |
|---|---|
| Shutter | Integrated electric |
| Frame | Powder-coated aluminium |
More detail on our shopfront and shutter packages page.
What shopfront and shutter packages cost in Deal
| Option | Guide price ex VAT | Inc VAT |
|---|---|---|
| Double frontage with two integrated shutters | £11,995–£14,995 | £14,394–£17,994 |
| Single shopfront with integrated electric shutter Recommended | £6,995–£10,995 | £8,394–£13,194 |
| Shutter added to an existing shopfront, box hidden behind fascia | £1,995–£3,495 | £2,394–£4,194 |
Guide prices, supply and fit, for a typical shopfront about 3 m × 2.5 m unless stated. Your fixed price is confirmed in writing after a free survey, before any work starts.
Planning rules for shutters in Deal
In England, an external shutter on a shopfront is normally treated as development that needs planning permission from your local planning authority, because it changes how the building looks. There is no permitted development right for shop shutters. Internal shutters fitted behind the glass usually sit outside planning control.
Listed buildings need listed building consent for works affecting their character, inside or out, and conservation areas bring closer scrutiny of the design. Many councils publish a shopfront design guide that prefers perforated, punched or internal shutters with the box hidden behind the fascia.
From enquiry to handover
Tell us about the shop
Send the postcode, the opening size if you know it and a photo if you can. We reply to arrange a survey.
Measure and check
We confirm sizes, fixings and power on site, and note anything that affects planning or the box position.
Fixed written quote
You receive a written quote with the specification, programme and a fixed price. Nothing is ordered until you accept.
Installation and handover
We fit the shutter, test it with you, explain daily use and the override, and hand over warranty and service details.
Common questions
Will I need planning permission for a shutter in Deal?
An external shutter normally needs planning permission from the local planning authority, while internal shutters behind the glass usually do not. Listed buildings and conservation areas need extra care. We provide the shutter specification for your application.
Do you repair shutters in Deal that you didn't fit?
Yes. We repair and service most makes of shop shutter, motor and control in Deal. If parts are no longer made, we explain the options in writing.
How long does a new shopfront take?
After survey, design and any planning approval, manufacture usually takes a few weeks and installation a few days. We give you a programme in writing with the quote.
Can I reuse my existing shutter?
Sometimes, if it is in good condition and suits the new layout. We assess it at survey.