Shopfront & shutter packages in Coatbridge: what to expect
Shops in the ML5 postcode district range from convenience stores to takeaways, salons and specialist retailers. We tailor shopfront and shutter packages to the stock you hold and the hours you open, and say plainly where a different option would serve you better.
If your Coatbridge shop is in a terrace with flats above, noise, box size and how the shutter looks from the street all matter. We talk through curtain types, colour and box position with you, and with your landlord if they need to approve the work.
Our coverage around Coatbridge takes in Airdrie, Easterhouse, Motherwell and the wider Lanarkshire area.

What our shopfront and shutter packages include
A new aluminium shopfront designed around an integrated shutter.
- One quote, one programme
- Level-access entrance options
- Specification for your planning application
- Toughened or laminated safety glazing
| Shutter | Integrated electric |
|---|---|
| Glass | Toughened or laminated |
| Doors | Single or double, level access options |
More detail on our shopfront and shutter packages page.
Prices for shopfront and shutter packages in Coatbridge
| Option | Guide price ex VAT | Inc VAT |
|---|---|---|
| Double frontage with two integrated shutters | £11,995–£14,995 | £14,394–£17,994 |
| Single shopfront with integrated electric shutter Recommended | £6,995–£10,995 | £8,394–£13,194 |
| Shutter added to an existing shopfront, box hidden behind fascia | £1,995–£3,495 | £2,394–£4,194 |
Guide prices, supply and fit, for a typical shopfront about 3 m × 2.5 m unless stated. Your fixed price is confirmed in writing after a free survey, before any work starts.
Do shutters in Coatbridge need planning permission?
In Scotland, planning permission for an external shop shutter comes from the council under the Town and Country Planning (Scotland) Act 1997, and an external shutter normally needs it because it alters the shopfront. Internal shutters behind the glass usually do not.
Listed buildings need listed building consent under the Planning (Listed Buildings and Conservation Areas) (Scotland) Act 1997, and Historic Environment Scotland publishes guidance on shopfronts. Conservation areas bring closer scrutiny of external shutters.
From enquiry to handover
Get in touch
Give us the postcode and what you are after. We confirm a survey slot and anything we need beforehand.
Measure and check
We confirm sizes, fixings and power on site, and note anything that affects planning or the box position.
Fixed written quote
You receive a written quote with the specification, programme and a fixed price. Nothing is ordered until you accept.
Fit and test
After fitting we test every function with you and confirm servicing recommendations in writing.
Questions from shop owners in Coatbridge
Can you match my Coatbridge shopfront's colour?
Yes. Laths, box and guides can be powder coated to a RAL colour so the shutter matches your shopfront frame or fascia, which councils often prefer.
Will I need planning permission for a shutter in Coatbridge?
An external shutter normally needs planning permission from the council planning department, while internal shutters behind the glass usually do not. Listed buildings and conservation areas need extra care. We provide the shutter specification for your application.
Do you do the signage too?
We can coordinate signage, but signs often need separate advertisement consent and are quoted separately.
Can I reuse my existing shutter?
Sometimes, if it is in good condition and suits the new layout. We assess it at survey.