Planning shopfront and shutter packages in Bridgend
Planning teams apply their own shopfront guidance, so we recommend the box position, colour and curtain that give an application in Bridgend the best chance, and provide the specification you or your agent need for it.
Every opening is measured on site. In Bridgend, as anywhere, we look at headroom above the glazing, side room for guide rails, the ground the bottom rail will close onto and any outward-opening doors, because each of these changes how the shutter is specified and fixed.
Nearby, we also cover Cowbridge, Llantwit Major and Maesteg.

What our shopfront and shutter packages include
A new aluminium shopfront designed around an integrated shutter.
- Toughened or laminated safety glazing
- Shutter box built into the fascia
- Level-access entrance options
- Specification for your planning application
| Planning | Specification supplied for your application |
|---|---|
| Shutter | Integrated electric |
| Doors | Single or double, level access options |
More detail on our shopfront and shutter packages page.
What shopfront and shutter packages cost in Bridgend
| Option | Guide price ex VAT | Inc VAT |
|---|---|---|
| Double frontage with two integrated shutters | £11,995–£14,995 | £14,394–£17,994 |
| Single shopfront with integrated electric shutter Recommended | £6,995–£10,995 | £8,394–£13,194 |
| Shutter added to an existing shopfront, box hidden behind fascia | £1,995–£3,495 | £2,394–£4,194 |
Guide prices, supply and fit, for a typical shopfront about 3 m × 2.5 m unless stated. Your fixed price is confirmed in writing after a free survey, before any work starts.
Consents for shopfronts in Bridgend
In Wales, your local planning authority decides whether an external shop shutter needs planning permission, and in practice one is normally required because the shutter changes the frontage. Shutters fitted inside the shop, behind the glass, usually fall outside planning control.
Cadw is the heritage body for Wales. Under the Historic Environment (Wales) Act 2023, listed buildings still need listed building consent for works that affect their character, and conservation areas bring closer attention to design, so it is worth asking the council for pre-application advice.
Four steps to a new shutter
Get in touch
Give us the postcode and what you are after. We confirm a survey slot and anything we need beforehand.
Free survey
We measure the opening, check the fascia, fixings and power, and talk through planning and landlord consent.
Quote in writing
We send the specification and a fixed price in writing, with a deposit only on acceptance.
Made, fitted, explained
The shutter is made to measure and fitted, then we show you how to use it and the manual override, and leave the paperwork.
Shopfront & shutter packages in Bridgend: questions
Can you match my Bridgend shopfront's colour?
Yes. Laths, box and guides can be powder coated to a RAL colour so the shutter matches your shopfront frame or fascia, which councils often prefer.
How quickly can a shutter be fitted in Bridgend?
Shutters are made to measure after the survey and any planning approval, then most single shopfronts are fitted in a day. We confirm a realistic programme in writing with your quote rather than promising a date we cannot keep.
Can you keep my shop trading during the work?
Often, with temporary boarding or a phased installation. We plan this with you before work starts.
Do you do the signage too?
We can coordinate signage, but signs often need separate advertisement consent and are quoted separately.