Shopfront & shutter packages for shops in Kirkby-in-Ashfield
If your shop in Kirkby-in-Ashfield already has a shutter, we will tell you honestly whether a repair, a new motor, a conversion or a full replacement makes most sense before you spend anything.
If your Kirkby-in-Ashfield shop is in a terrace with flats above, noise, box size and how the shutter looks from the street all matter. We talk through curtain types, colour and box position with you, and with your landlord if they need to approve the work.
If you have more than one shop, we can combine visits in Kirkby-in-Ashfield, Sutton-in-Ashfield and Mansfield into a single day.

What's included
A new aluminium shopfront designed around an integrated shutter.
- Shutter box built into the fascia
- Powder-coated aluminium frames in any RAL colour
- Level-access entrance options
- Shopfront, doors, fascia and shutter designed as one
| Frame | Powder-coated aluminium |
|---|---|
| Shutter | Integrated electric |
| Planning | Specification supplied for your application |
More detail on our shopfront and shutter packages page.
What shopfront and shutter packages cost in Kirkby-in-Ashfield
| Option | Guide price ex VAT | Inc VAT |
|---|---|---|
| Double frontage with two integrated shutters | £11,995–£14,995 | £14,394–£17,994 |
| Single shopfront with integrated electric shutter Recommended | £6,995–£10,995 | £8,394–£13,194 |
| Shutter added to an existing shopfront, box hidden behind fascia | £1,995–£3,495 | £2,394–£4,194 |
Guide prices, supply and fit, for a typical shopfront about 3 m × 2.5 m unless stated. Your fixed price is confirmed in writing after a free survey, before any work starts.
Do shutters in Kirkby-in-Ashfield need planning permission?
English councils generally expect a planning application before an external roller shutter goes on a shopfront, since the shutter alters the appearance of the building; shop shutters have no permitted development right. A shutter installed inside, behind the glazing, does not usually need permission.
If the building is listed, listed building consent is needed as well, and in a conservation area the council will look harder at the curtain type, box position and colour. A council shopfront guide, where one exists, is the best place to start.
Four steps to a new shutter
Get in touch
Give us the postcode and what you are after. We confirm a survey slot and anything we need beforehand.
Survey on site
A surveyor measures up, photographs the frontage and checks headroom, side room and the ground the shutter closes onto.
Agree the price
Your written quote sets out exactly what is included. Payment terms on installations are 50% deposit, 40% on the first day of fitting and 10% on completion.
Installation and handover
We fit the shutter, test it with you, explain daily use and the override, and hand over warranty and service details.
Shopfront & shutter packages in Kirkby-in-Ashfield: questions
Can you match my Kirkby-in-Ashfield shopfront's colour?
Yes. Laths, box and guides can be powder coated to a RAL colour so the shutter matches your shopfront frame or fascia, which councils often prefer.
Will I need planning permission for a shutter in Kirkby-in-Ashfield?
An external shutter normally needs planning permission from the local planning authority, while internal shutters behind the glass usually do not. Listed buildings and conservation areas need extra care. We provide the shutter specification for your application.
Can you keep my shop trading during the work?
Often, with temporary boarding or a phased installation. We plan this with you before work starts.
Can I reuse my existing shutter?
Sometimes, if it is in good condition and suits the new layout. We assess it at survey.