Planning shopfront and shutter packages in Brecon
Every opening is measured on site. In Brecon, as anywhere, we look at headroom above the glazing, side room for guide rails, the ground the bottom rail will close onto and any outward-opening doors, because each of these changes how the shutter is specified and fixed.
If your Brecon shop is in a terrace with flats above, noise, box size and how the shutter looks from the street all matter. We talk through curtain types, colour and box position with you, and with your landlord if they need to approve the work.
From Brecon our coverage runs out to Merthyr Tydfil, Ebbw Vale and Aberdare, with islands and remote areas by arrangement.

Shopfront & shutter packages: what you get
A new aluminium shopfront designed around an integrated shutter.
- Shopfront, doors, fascia and shutter designed as one
- Specification for your planning application
- Powder-coated aluminium frames in any RAL colour
- One quote, one programme
| Shutter | Integrated electric |
|---|---|
| Planning | Specification supplied for your application |
| Frame | Powder-coated aluminium |
More detail on our shopfront and shutter packages page.
Guide prices in Brecon
| Option | Guide price ex VAT | Inc VAT |
|---|---|---|
| Double frontage with two integrated shutters | £11,995–£14,995 | £14,394–£17,994 |
| Single shopfront with integrated electric shutter Recommended | £6,995–£10,995 | £8,394–£13,194 |
| Shutter added to an existing shopfront, box hidden behind fascia | £1,995–£3,495 | £2,394–£4,194 |
Guide prices, supply and fit, for a typical shopfront about 3 m × 2.5 m unless stated. Your fixed price is confirmed in writing after a free survey, before any work starts.
Planning rules for shutters in Brecon
In Wales, your local planning authority decides whether an external shop shutter needs planning permission, and in practice one is normally required because the shutter changes the frontage. Shutters fitted inside the shop, behind the glass, usually fall outside planning control.
Cadw is the heritage body for Wales. Under the Historic Environment (Wales) Act 2023, listed buildings still need listed building consent for works that affect their character, and conservation areas bring closer attention to design, so it is worth asking the council for pre-application advice.
How it works
Get in touch
Give us the postcode and what you are after. We confirm a survey slot and anything we need beforehand.
Free survey
We measure the opening, check the fascia, fixings and power, and talk through planning and landlord consent.
Fixed written quote
You receive a written quote with the specification, programme and a fixed price. Nothing is ordered until you accept.
Made, fitted, explained
The shutter is made to measure and fitted, then we show you how to use it and the manual override, and leave the paperwork.
Shopfront & shutter packages in Brecon: questions
Will I need planning permission for a shutter in Brecon?
An external shutter normally needs planning permission from the local planning authority, while internal shutters behind the glass usually do not. Listed buildings and conservation areas need extra care. We provide the shutter specification for your application.
How quickly can a shutter be fitted in Brecon?
Shutters are made to measure after the survey and any planning approval, then most single shopfronts are fitted in a day. We confirm a realistic programme in writing with your quote rather than promising a date we cannot keep.
Can you keep my shop trading during the work?
Often, with temporary boarding or a phased installation. We plan this with you before work starts.
Do you do the signage too?
We can coordinate signage, but signs often need separate advertisement consent and are quoted separately.