LPS 1175 high-security shutters in Alloa: what to expect
Each shutter is made to measure before the fitting visit, so most single shopfronts in Alloa are fitted in one day once planning and landlord consent are in place. We plan the visit around your trading hours where we can.
Every opening is measured on site. In Alloa, as anywhere, we look at headroom above the glazing, side room for guide rails, the ground the bottom rail will close onto and any outward-opening doors, because each of these changes how the shutter is specified and fixed.
Nearby, we also cover Stirling, Grangemouth and Falkirk; Alloa is about 6 miles from Stirling.

LPS 1175 high-security shutters: what you get
Manufacturer-certified shutters for jewellers, phone shops and pharmacies.
- Products certified to LPS 1175 by the manufacturer
- Vision panel options on some products
- Annual servicing recommended
- Deep guides and anti-lift features
| Standard | LPS 1175 (Issue 8 letter–number rating) |
|---|---|
| Locking | Multi-point |
| Curtain | Double-wall or reinforced |
More detail on our high-security shop shutters page.
Guide prices in Alloa
| Option | Guide price ex VAT | Inc VAT |
|---|---|---|
| Higher ratings (C5 / SR3 and above) | From £5,495 | From £6,594 |
| LPS 1175 B3 (broadly SR2) Recommended | £4,295–£5,995 | £5,154–£7,194 |
| LPS 1175 A1 (broadly SR1) | £3,495–£4,495 | £4,194–£5,394 |
Guide prices, supply and fit, for a typical shopfront about 3 m × 2.5 m unless stated. Your fixed price is confirmed in writing after a free survey, before any work starts.
Planning and listed buildings in Alloa
Scottish councils normally require planning permission before an external roller shutter is fitted to a shopfront. A shutter fitted inside, behind the glazing, is generally outside planning control.
If the building is listed, listed building consent is needed too, and Historic Environment Scotland's guidance is a useful reference; in conservation areas, councils often prefer internal or open-mesh designs.
How it works
Send your details
Use the form, freephone or chat to tell us what you need. A short description and a photo help us bring the right information to the survey.
Survey on site
A surveyor measures up, photographs the frontage and checks headroom, side room and the ground the shutter closes onto.
Agree the price
Your written quote sets out exactly what is included. Payment terms on installations are 50% deposit, 40% on the first day of fitting and 10% on completion.
Fit and test
After fitting we test every function with you and confirm servicing recommendations in writing.
Common questions
Do you repair shutters in Alloa that you didn't fit?
Yes. We repair and service most makes of shop shutter, motor and control in Alloa. If parts are no longer made, we explain the options in writing.
Do you cover Alloa?
Yes. We cover Alloa and the FK10 area, as well as Stirling and Grangemouth. Book through the form, freephone 0800 088 6248 or live chat.
Do high-security shutters need planning permission?
Yes, an external shutter usually does, and its bulkier box may draw more attention from planners. A concealed box or internal position can help.
What is the difference between SR ratings and A1–H20?
SR1 to SR8 came from an earlier issue of LPS 1175. Issue 8 uses a letter for the toolset and a number for the delay in minutes. The ratings broadly correspond, and your insurer may use either.