Shopfronts in Hammersmith and high-security shop shutters
Every opening is measured on site. In Hammersmith, as anywhere, we look at headroom above the glazing, side room for guide rails, the ground the bottom rail will close onto and any outward-opening doors, because each of these changes how the shutter is specified and fixed.
Each shutter is made to measure before the fitting visit, so most single shopfronts in Hammersmith are fitted in one day once planning and landlord consent are in place. We plan the visit around your trading hours where we can.
From Hammersmith our coverage runs out to Fulham, Kensington and Chelsea, with islands and remote areas by arrangement.

About our high-security shop shutters
Manufacturer-certified shutters for jewellers, phone shops and pharmacies.
- Installed to the manufacturer's conditions
- Annual servicing recommended
- Products certified to LPS 1175 by the manufacturer
- Deep guides and anti-lift features
| Paperwork | Certificate reference supplied |
|---|---|
| Standard | LPS 1175 (Issue 8 letter–number rating) |
| Certified by | Manufacturer, listed in the LPCB Red Book |
More detail on our high-security shop shutters page.
Guide prices in Hammersmith
| Option | Guide price ex VAT | Inc VAT |
|---|---|---|
| Higher ratings (C5 / SR3 and above) | From £5,495 | From £6,594 |
| LPS 1175 B3 (broadly SR2) Recommended | £4,295–£5,995 | £5,154–£7,194 |
| LPS 1175 A1 (broadly SR1) | £3,495–£4,495 | £4,194–£5,394 |
Guide prices, supply and fit, for a typical shopfront about 3 m × 2.5 m unless stated. Your fixed price is confirmed in writing after a free survey, before any work starts.
Planning rules for shutters in Hammersmith
English councils generally expect a planning application before an external roller shutter goes on a shopfront, since the shutter alters the appearance of the building; shop shutters have no permitted development right. A shutter installed inside, behind the glazing, does not usually need permission.
If the building is listed, listed building consent is needed as well, and in a conservation area the council will look harder at the curtain type, box position and colour. A council shopfront guide, where one exists, is the best place to start.
What happens next
Send your details
Use the form, freephone or chat to tell us what you need. A short description and a photo help us bring the right information to the survey.
Survey on site
A surveyor measures up, photographs the frontage and checks headroom, side room and the ground the shutter closes onto.
Quote in writing
We send the specification and a fixed price in writing, with a deposit only on acceptance.
Fit and test
After fitting we test every function with you and confirm servicing recommendations in writing.
LPS 1175 high-security shutters in Hammersmith: questions
Do you cover Hammersmith?
Yes. We cover Hammersmith and the W6 area, as well as Fulham and Kensington. Book through the form, freephone 0800 088 6248 or live chat.
How quickly can a shutter be fitted in Hammersmith?
Shutters are made to measure after the survey and any planning approval, then most single shopfronts are fitted in a day. We confirm a realistic programme in writing with your quote rather than promising a date we cannot keep.
Do high-security shutters need planning permission?
Yes, an external shutter usually does, and its bulkier box may draw more attention from planners. A concealed box or internal position can help.
Which rating does my insurer want?
Only your insurer can say. Ask them to put the required rating in writing, then we quote a certified product that meets it.