LPS 1175 high-security shutters in Hawick: what to expect
Where a shop opens onto a busy pavement, safety during fitting and in daily use matters. We cordon the work area, fix guides into sound masonry or steel, and set electric controls so the person operating the shutter can see the curtain while it moves.
If your Hawick shop is in a terrace with flats above, noise, box size and how the shutter looks from the street all matter. We talk through curtain types, colour and box position with you, and with your landlord if they need to approve the work.
We also cover Galashiels, Kelso and Peebles, and the rest of Scottish Borders.

What's included
Manufacturer-certified shutters for jewellers, phone shops and pharmacies.
- Vision panel options on some products
- Installed to the manufacturer's conditions
- Deep guides and anti-lift features
- Multi-point locking bottom rails
| Paperwork | Certificate reference supplied |
|---|---|
| Curtain | Double-wall or reinforced |
| Standard | LPS 1175 (Issue 8 letter–number rating) |
More detail on our high-security shop shutters page.
What high-security shop shutters cost in Hawick
| Option | Guide price ex VAT | Inc VAT |
|---|---|---|
| Higher ratings (C5 / SR3 and above) | From £5,495 | From £6,594 |
| LPS 1175 B3 (broadly SR2) Recommended | £4,295–£5,995 | £5,154–£7,194 |
| LPS 1175 A1 (broadly SR1) | £3,495–£4,495 | £4,194–£5,394 |
Guide prices, supply and fit, for a typical shopfront about 3 m × 2.5 m unless stated. Your fixed price is confirmed in writing after a free survey, before any work starts.
Do shutters in Hawick need planning permission?
Scottish councils normally require planning permission before an external roller shutter is fitted to a shopfront. A shutter fitted inside, behind the glazing, is generally outside planning control.
If the building is listed, listed building consent is needed too, and Historic Environment Scotland's guidance is a useful reference; in conservation areas, councils often prefer internal or open-mesh designs.
What happens next
Tell us about the shop
Send the postcode, the opening size if you know it and a photo if you can. We reply to arrange a survey.
Measure and check
We confirm sizes, fixings and power on site, and note anything that affects planning or the box position.
Fixed written quote
You receive a written quote with the specification, programme and a fixed price. Nothing is ordered until you accept.
Installation and handover
We fit the shutter, test it with you, explain daily use and the override, and hand over warranty and service details.
Questions from shop owners in Hawick
Will I need planning permission for a shutter in Hawick?
An external shutter normally needs planning permission from the council planning department, while internal shutters behind the glass usually do not. Listed buildings and conservation areas need extra care. We provide the shutter specification for your application.
Do you repair shutters in Hawick that you didn't fit?
Yes. We repair and service most makes of shop shutter, motor and control in Hawick. If parts are no longer made, we explain the options in writing.
Do high-security shutters need planning permission?
Yes, an external shutter usually does, and its bulkier box may draw more attention from planners. A concealed box or internal position can help.
What is the difference between SR ratings and A1–H20?
SR1 to SR8 came from an earlier issue of LPS 1175. Issue 8 uses a letter for the toolset and a number for the delay in minutes. The ratings broadly correspond, and your insurer may use either.