Solid steel shop shutters across Ayrshire & Arran
Ayrshire & Arran has everything from historic market-town frontages to modern units, and shutters for them differ. Our surveys look at the fascia, reveals, fixings and power on each shop rather than assuming a standard size.
For listed buildings and conservation areas in Ayrshire & Arran, internal shutters, perforated or punched curtains and concealed boxes tend to sit better with planning officers than solid external shutters.
Each shutter is made to measure before the fitting visit, so most single shopfronts in Ayrshire & Arran are fitted in one day once planning and landlord consent are in place.

About our solid steel shop shutters
Full-cover galvanised steel laths for maximum privacy and weather protection.
- Finished galvanised, or powder coated to a RAL colour
- Wind locks and end stops to keep the curtain in its guides
- Lockable bottom rail with ground or side locks
- Optional key switch, remote or timer on electric versions
- Galvanised steel laths, single-wall as standard, double-wall on request
| Vision | No vision panels, fully solid |
|---|---|
| Finish | Galvanised or powder coated (RAL) |
| Operation | Manual or electric |
| Typical box | 205–300 mm depending on drop |
More detail on our solid steel shop shutters page.
What solid steel shop shutters cost in Ayrshire & Arran
| Option | Guide price ex VAT | Inc VAT |
|---|---|---|
| Solid steel, electric, box hidden behind the fascia | £1,995–£3,495 | £2,394–£4,194 |
| Solid steel, electric, face-fit box Recommended | £1,495–£2,695 | £1,794–£3,234 |
| Solid steel, manual | £895–£1,495 | £1,074–£1,794 |
Guide prices, supply and fit, for a typical shopfront about 3 m × 2.5 m unless stated. Your fixed price is confirmed in writing after a free survey, before any work starts.
Consents for shopfronts in Ayrshire & Arran
Scottish councils normally require planning permission before an external roller shutter is fitted to a shopfront. A shutter fitted inside, behind the glazing, is generally outside planning control.
If the building is listed, listed building consent is needed too, and Historic Environment Scotland's guidance is a useful reference; in conservation areas, councils often prefer internal or open-mesh designs.
How it works
Get in touch
Give us the postcode and what you are after. We confirm a survey slot and anything we need beforehand.
Survey on site
A surveyor measures up, photographs the frontage and checks headroom, side room and the ground the shutter closes onto.
Agree the price
Your written quote sets out exactly what is included. Payment terms on installations are 50% deposit, 40% on the first day of fitting and 10% on completion.
Installation and handover
We fit the shutter, test it with you, explain daily use and the override, and hand over warranty and service details.
Solid steel shop shutters in Ayrshire & Arran: questions
How quickly can a shutter be fitted in Ayrshire & Arran?
Shutters are made to measure after the survey and any planning approval, then most single shopfronts are fitted in a day. We confirm a realistic programme in writing with your quote rather than promising a date we cannot keep.
Is the survey free in Ayrshire & Arran?
The survey and written quote are free for new shutters in Ayrshire & Arran. Repair and service visits are charged, with a diagnostic visit from £125 ex VAT, and we tell you the cost before we attend.
Is a solid shutter more secure than a perforated one?
Not automatically. Security depends on the lath gauge, the guides, the bottom-rail locking and how the shutter is fixed. A solid curtain hides the interior, which deters opportunists, but a well-specified perforated shutter can resist the same tools. If your insurer names a rating, we quote a certified product.
Do solid shop shutters need planning permission?
An external solid shutter usually needs planning permission because it changes how the shopfront looks, and many councils prefer perforated, punched or internal shutters in town centres. We provide the shutter specification for your application, and the final decision always sits with your local planning authority.