Solid steel shop shutters across Dorset
Councils across Dorset each apply their own shopfront policies, so what is acceptable on one high street may be resisted on the next. We take that into account when we recommend a curtain, box position and colour, and we provide the specification for your application.
Each shutter is made to measure before the fitting visit, so most single shopfronts in Dorset are fitted in one day once planning and landlord consent are in place.
For listed buildings and conservation areas in Dorset, internal shutters, perforated or punched curtains and concealed boxes tend to sit better with planning officers than solid external shutters.

About our solid steel shop shutters
Full-cover galvanised steel laths for maximum privacy and weather protection.
- Finished galvanised, or powder coated to a RAL colour
- Wind locks and end stops to keep the curtain in its guides
- Manual override fitted to electric shutters
- Lockable bottom rail with ground or side locks
- Face-fit, under-fascia or concealed behind the fascia
| Operation | Manual or electric |
|---|---|
| Typical box | 205–300 mm depending on drop |
| Curtain | Roll-formed galvanised steel laths, 75–77 mm |
| Finish | Galvanised or powder coated (RAL) |
More detail on our solid steel shop shutters page.
Prices for solid steel shop shutters in Dorset
| Option | Guide price ex VAT | Inc VAT |
|---|---|---|
| Solid steel, electric, box hidden behind the fascia | £1,995–£3,495 | £2,394–£4,194 |
| Solid steel, electric, face-fit box Recommended | £1,495–£2,695 | £1,794–£3,234 |
| Solid steel, manual | £895–£1,495 | £1,074–£1,794 |
Guide prices, supply and fit, for a typical shopfront about 3 m × 2.5 m unless stated. Your fixed price is confirmed in writing after a free survey, before any work starts.
Do shutters in Dorset need planning permission?
In England, an external shutter on a shopfront is normally treated as development that needs planning permission from your local planning authority, because it changes how the building looks. There is no permitted development right for shop shutters. Internal shutters fitted behind the glass usually sit outside planning control.
Listed buildings need listed building consent for works affecting their character, inside or out, and conservation areas bring closer scrutiny of the design. Many councils publish a shopfront design guide that prefers perforated, punched or internal shutters with the box hidden behind the fascia.
How it works
Send your details
Use the form, freephone or chat to tell us what you need. A short description and a photo help us bring the right information to the survey.
Measure and check
We confirm sizes, fixings and power on site, and note anything that affects planning or the box position.
Fixed written quote
You receive a written quote with the specification, programme and a fixed price. Nothing is ordered until you accept.
Made, fitted, explained
The shutter is made to measure and fitted, then we show you how to use it and the manual override, and leave the paperwork.
Solid steel shop shutters in Dorset: questions
Do you cover all of Dorset?
Yes. We cover every town in Dorset, including Bournemouth, Poole and Weymouth, with islands and remote areas by arrangement. Book through the form, freephone 0800 088 6248 or live chat.
How quickly can a shutter be fitted in Dorset?
Shutters are made to measure after the survey and any planning approval, then most single shopfronts are fitted in a day. We confirm a realistic programme in writing with your quote rather than promising a date we cannot keep.
Do solid shop shutters need planning permission?
An external solid shutter usually needs planning permission because it changes how the shopfront looks, and many councils prefer perforated, punched or internal shutters in town centres. We provide the shutter specification for your application, and the final decision always sits with your local planning authority.
How long does fitting take?
Most single shopfront shutters are fitted in a day once made. Larger openings, concealed boxes or electrical work can add time, and we confirm the plan in writing after the survey.