Shopfronts in Banstead and solid steel shop shutters
If your Banstead shop is in a terrace with flats above, noise, box size and how the shutter looks from the street all matter. We talk through curtain types, colour and box position with you, and with your landlord if they need to approve the work.
Before quoting in Banstead, we confirm who owns the frontage, whether the lease restricts external alterations and whether the building is listed or in a conservation area. Sorting that early avoids paying for something that cannot be fitted.
If you have more than one shop, we can combine visits in Banstead, Sutton and Ewell into a single day.

What our solid steel shop shutters include
Full-cover galvanised steel laths for maximum privacy and weather protection.
- Face-fit, under-fascia or concealed behind the fascia
- Finished galvanised, or powder coated to a RAL colour
- Lockable bottom rail with ground or side locks
- Galvanised steel laths, single-wall as standard, double-wall on request
| Vision | No vision panels, fully solid |
|---|---|
| Finish | Galvanised or powder coated (RAL) |
| Curtain | Roll-formed galvanised steel laths, 75–77 mm |
More detail on our solid steel shop shutters page.
Prices for solid steel shop shutters in Banstead
| Option | Guide price ex VAT | Inc VAT |
|---|---|---|
| Solid steel, electric, box hidden behind the fascia | £1,995–£3,495 | £2,394–£4,194 |
| Solid steel, electric, face-fit box Recommended | £1,495–£2,695 | £1,794–£3,234 |
| Solid steel, manual | £895–£1,495 | £1,074–£1,794 |
Guide prices, supply and fit, for a typical shopfront about 3 m × 2.5 m unless stated. Your fixed price is confirmed in writing after a free survey, before any work starts.
Do shutters in Banstead need planning permission?
In England, an external shutter on a shopfront is normally treated as development that needs planning permission from your local planning authority, because it changes how the building looks. There is no permitted development right for shop shutters. Internal shutters fitted behind the glass usually sit outside planning control.
Listed buildings need listed building consent for works affecting their character, inside or out, and conservation areas bring closer scrutiny of the design. Many councils publish a shopfront design guide that prefers perforated, punched or internal shutters with the box hidden behind the fascia.
From enquiry to handover
Get in touch
Give us the postcode and what you are after. We confirm a survey slot and anything we need beforehand.
Survey on site
A surveyor measures up, photographs the frontage and checks headroom, side room and the ground the shutter closes onto.
Agree the price
Your written quote sets out exactly what is included. Payment terms on installations are 50% deposit, 40% on the first day of fitting and 10% on completion.
Made, fitted, explained
The shutter is made to measure and fitted, then we show you how to use it and the manual override, and leave the paperwork.
Common questions
How quickly can a shutter be fitted in Banstead?
Shutters are made to measure after the survey and any planning approval, then most single shopfronts are fitted in a day. We confirm a realistic programme in writing with your quote rather than promising a date we cannot keep.
Will I need planning permission for a shutter in Banstead?
An external shutter normally needs planning permission from the local planning authority, while internal shutters behind the glass usually do not. Listed buildings and conservation areas need extra care. We provide the shutter specification for your application.
Is a solid shutter more secure than a perforated one?
Not automatically. Security depends on the lath gauge, the guides, the bottom-rail locking and how the shutter is fixed. A solid curtain hides the interior, which deters opportunists, but a well-specified perforated shutter can resist the same tools. If your insurer names a rating, we quote a certified product.
Can a solid shutter be painted to match my shopfront?
Yes. The laths, guides and box can be powder coated to a RAL colour at the factory, which lasts far longer than painting on site. Colour-matching to the shopfront frame is often welcomed by planning officers.