Somerset · BA1

Shop window shutters in Bath

We supply, fit and look after shop window shutters for shops in Bath (BA1). Tell us about the opening and we will arrange a free survey, then confirm a fixed price in writing before any work starts.

  • Safety devices fitted where the controls need them
  • One point of contact from survey to handover
  • Specification provided for planning applications
  • Made to measure for your opening

Free survey in Bath

Tell us about your shop. We reply to arrange a survey and send a fixed written quote.

We use your details only to reply about this enquiry. See our privacy notice. Surveys for new shutters are free; repair and service visits are charged.

Shop window shutters for shops in Bath

Where a shop opens onto a busy pavement, safety during fitting and in daily use matters. We cordon the work area, fix guides into sound masonry or steel, and set electric controls so the person operating the shutter can see the curtain while it moves.

Every opening is measured on site. In Bath, as anywhere, we look at headroom above the glazing, side room for guide rails, the ground the bottom rail will close onto and any outward-opening doors, because each of these changes how the shutter is specified and fixed.

We also work in Trowbridge and Kingswood, so a visit in Bath can usually be fitted around others in Somerset.

Row of small steel roller shutters lowered over the side windows of a corner shop

What our shop window shutters include

Individual shutters for side windows, upper windows and back-of-shop openings.

  • Useful on corner units and rear elevations
  • Made for individual window openings
  • Manual or electric
  • Grouped control from one switch, or separate
ControlGrouped or individual
CurtainAluminium, steel, perforated or vision
FittingFace-fit, reveal-fit or internal

More detail on our shop window shutters page.

Guide prices in Bath

Guide prices for shop window shutters in Bath
OptionGuide price ex VATInc VAT
Electric insulated window shutter£795–£995£954–£1,194
Manual steel window shutter Recommended£595–£895£714–£1,074
Push-up shutter, small window£495–£695£594–£834

Guide prices, supply and fit, for a typical shopfront about 3 m × 2.5 m unless stated. Your fixed price is confirmed in writing after a free survey, before any work starts.

England

Planning and listed buildings in Bath

English councils generally expect a planning application before an external roller shutter goes on a shopfront, since the shutter alters the appearance of the building; shop shutters have no permitted development right. A shutter installed inside, behind the glazing, does not usually need permission.

If the building is listed, listed building consent is needed as well, and in a conservation area the council will look harder at the curtain type, box position and colour. A council shopfront guide, where one exists, is the best place to start.

Read the full planning guide

How it works

  1. Get in touch

    Give us the postcode and what you are after. We confirm a survey slot and anything we need beforehand.

  2. Survey on site

    A surveyor measures up, photographs the frontage and checks headroom, side room and the ground the shutter closes onto.

  3. Agree the price

    Your written quote sets out exactly what is included. Payment terms on installations are 50% deposit, 40% on the first day of fitting and 10% on completion.

  4. Fit and test

    After fitting we test every function with you and confirm servicing recommendations in writing.

Questions from shop owners in Bath

Will I need planning permission for a shutter in Bath?

An external shutter normally needs planning permission from the local planning authority, while internal shutters behind the glass usually do not. Listed buildings and conservation areas need extra care. We provide the shutter specification for your application.

How quickly can a shutter be fitted in Bath?

Shutters are made to measure after the survey and any planning approval, then most single shopfronts are fitted in a day. We confirm a realistic programme in writing with your quote rather than promising a date we cannot keep.

Can several window shutters work from one switch?

Yes, electric window shutters can be grouped onto one key switch or timer, or wired individually.

Will window shutters need planning permission?

External shutters on visible elevations usually need planning permission; rear and internal installations vary. Check with your local planning authority.

Free survey for new shutters

Book a free survey in Bath

Get a fixed, written price for shop window shutters in Bath, starting with a free survey. We reply to every enquiry and confirm prices in writing before any work.

Call freeGet a quote