Shopfronts in Chatham and electric shop shutters
Every opening is measured on site. In Chatham, as anywhere, we look at headroom above the glazing, side room for guide rails, the ground the bottom rail will close onto and any outward-opening doors, because each of these changes how the shutter is specified and fixed.
Where a shop opens onto a busy pavement, safety during fitting and in daily use matters. We cordon the work area, fix guides into sound masonry or steel, and set electric controls so the person operating the shutter can see the curtain while it moves.
We also work in Rochester and Gillingham, so a visit in Chatham can usually be fitted around others in Kent.

About our electric shop shutters
Motorised shutters with key switch, remote or timer, and a manual override.
- Works with solid, perforated, vision and grille curtains
- Safety edges and photocells where controls require them
- Manual override on every installation
- Tubular or external motors sized to the curtain weight
| Override | Crank, hand chain or release |
|---|---|
| Controls | Key switch, remote, timer |
| Power | Fused spur near the box |
More detail on our electric shop shutters page.
Guide prices
| Option | Guide price ex VAT | Inc VAT |
|---|---|---|
| Electric solid shutter, box hidden behind the fascia | £1,995–£3,495 | £2,394–£4,194 |
| Electric solid shutter, face-fit box Recommended | £1,495–£2,695 | £1,794–£3,234 |
| Converting an existing manual shutter to electric | £595–£1,195 | £714–£1,434 |
Guide prices, supply and fit, for a typical shopfront about 3 m × 2.5 m unless stated. Your fixed price is confirmed in writing after a free survey, before any work starts.
Planning rules for shutters in Chatham
English councils generally expect a planning application before an external roller shutter goes on a shopfront, since the shutter alters the appearance of the building; shop shutters have no permitted development right. A shutter installed inside, behind the glazing, does not usually need permission.
If the building is listed, listed building consent is needed as well, and in a conservation area the council will look harder at the curtain type, box position and colour. A council shopfront guide, where one exists, is the best place to start.
Four steps to a new shutter
Send your details
Use the form, freephone or chat to tell us what you need. A short description and a photo help us bring the right information to the survey.
Survey on site
A surveyor measures up, photographs the frontage and checks headroom, side room and the ground the shutter closes onto.
Fixed written quote
You receive a written quote with the specification, programme and a fixed price. Nothing is ordered until you accept.
Made, fitted, explained
The shutter is made to measure and fitted, then we show you how to use it and the manual override, and leave the paperwork.
Common questions
Can you match my Chatham shopfront's colour?
Yes. Laths, box and guides can be powder coated to a RAL colour so the shutter matches your shopfront frame or fascia, which councils often prefer.
Will I need planning permission for a shutter in Chatham?
An external shutter normally needs planning permission from the local planning authority, while internal shutters behind the glass usually do not. Listed buildings and conservation areas need extra care. We provide the shutter specification for your application.
How noisy is an electric shutter?
Tubular motors are fairly quiet; larger external motors hum slightly more. Insulated aluminium laths run quieter than single-skin steel.
Does an electric shutter need a separate power supply?
It needs a suitable fused supply near the shutter box. If one is not there, our electrician installs it to BS 7671 as part of the job and we include it in the written quote.