Shopfronts in Warminster and electric shop shutters
Planning teams apply their own shopfront guidance, so we recommend the box position, colour and curtain that give an application in Warminster the best chance, and provide the specification you or your agent need for it.
Shopfronts differ a lot, from Victorian parades with timber fascias to modern aluminium units, and the right specification depends on which you have. At survey in Warminster we check the depth behind the fascia, the condition of the reveals and the route for any power supply, so the quote reflects your actual frontage rather than a catalogue size.
Nearby, we also cover Frome, Trowbridge and Melksham; Warminster is about 30 miles from Swindon.

About our electric shop shutters
Motorised shutters with key switch, remote or timer, and a manual override.
- Key switch, remote, timer or hold-to-run controls
- Annual service plan available
- Safety edges and photocells where controls require them
- Electrics to BS 7671 by qualified electricians
| Override | Crank, hand chain or release |
|---|---|
| Drive | Tubular or external motor |
| Safety | To BS EN 12453 where required |
More detail on our electric shop shutters page.
Guide prices in Warminster
| Option | Guide price ex VAT | Inc VAT |
|---|---|---|
| Electric solid shutter, box hidden behind the fascia | £1,995–£3,495 | £2,394–£4,194 |
| Electric solid shutter, face-fit box Recommended | £1,495–£2,695 | £1,794–£3,234 |
| Converting an existing manual shutter to electric | £595–£1,195 | £714–£1,434 |
Guide prices, supply and fit, for a typical shopfront about 3 m × 2.5 m unless stated. Your fixed price is confirmed in writing after a free survey, before any work starts.
Do shutters in Warminster need planning permission?
English councils generally expect a planning application before an external roller shutter goes on a shopfront, since the shutter alters the appearance of the building; shop shutters have no permitted development right. A shutter installed inside, behind the glazing, does not usually need permission.
If the building is listed, listed building consent is needed as well, and in a conservation area the council will look harder at the curtain type, box position and colour. A council shopfront guide, where one exists, is the best place to start.
What happens next
Get in touch
Give us the postcode and what you are after. We confirm a survey slot and anything we need beforehand.
Measure and check
We confirm sizes, fixings and power on site, and note anything that affects planning or the box position.
Quote in writing
We send the specification and a fixed price in writing, with a deposit only on acceptance.
Made, fitted, explained
The shutter is made to measure and fitted, then we show you how to use it and the manual override, and leave the paperwork.
Electric shop shutters in Warminster: questions
Will I need planning permission for a shutter in Warminster?
An external shutter normally needs planning permission from the local planning authority, while internal shutters behind the glass usually do not. Listed buildings and conservation areas need extra care. We provide the shutter specification for your application.
Do you repair shutters in Warminster that you didn't fit?
Yes. We repair and service most makes of shop shutter, motor and control in Warminster. If parts are no longer made, we explain the options in writing.
Can I open my shutter from my phone?
App and smart-hub control is available on some motors. For security, many shops still prefer a key switch or remote that only works close to the shutter.
How noisy is an electric shutter?
Tubular motors are fairly quiet; larger external motors hum slightly more. Insulated aluminium laths run quieter than single-skin steel.