Manual-to-electric conversion in Reading: what to expect
Each shutter is made to measure before the fitting visit, so most single shopfronts in Reading are fitted in one day once planning and landlord consent are in place. We plan the visit around your trading hours where we can.
Every opening is measured on site. In Reading, as anywhere, we look at headroom above the glazing, side room for guide rails, the ground the bottom rail will close onto and any outward-opening doors, because each of these changes how the shutter is specified and fixed.
Nearby, we also cover Wokingham, Crowthorne and Yateley.

What our manual-to-electric shutter conversions include
Motorise an existing manual shutter with a new drive, controls and override.
- Key switch, remote or timer control
- Fused supply and wiring to BS 7671
- Safety devices where controls need them
- Motor sized to the curtain weight
| Wiring | To BS 7671 |
|---|---|
| Includes | Motor, controls, wiring, override |
| Controls | Key switch, remote, timer |
More detail on our manual-to-electric shutter conversions page.
What manual-to-electric shutter conversions cost in Reading
| Option | Guide price ex VAT | Inc VAT |
|---|---|---|
| Heavier shopfront shutter, external motor | £895–£1,195 | £1,074–£1,434 |
| Standard shopfront shutter, tubular motor Recommended | £595–£895 | £714–£1,074 |
| New power supply if none is present | Priced at survey | Priced at survey |
Guide prices, supply and fit, for a typical shopfront about 3 m × 2.5 m unless stated. Your fixed price is confirmed in writing after a free survey, before any work starts.
Do shutters in Reading need planning permission?
English councils generally expect a planning application before an external roller shutter goes on a shopfront, since the shutter alters the appearance of the building; shop shutters have no permitted development right. A shutter installed inside, behind the glazing, does not usually need permission.
If the building is listed, listed building consent is needed as well, and in a conservation area the council will look harder at the curtain type, box position and colour. A council shopfront guide, where one exists, is the best place to start.
How it works
Get in touch
Give us the postcode and what you are after. We confirm a survey slot and anything we need beforehand.
Free survey
We measure the opening, check the fascia, fixings and power, and talk through planning and landlord consent.
Agree the price
Your written quote sets out exactly what is included. Payment terms on installations are 50% deposit, 40% on the first day of fitting and 10% on completion.
Installation and handover
We fit the shutter, test it with you, explain daily use and the override, and hand over warranty and service details.
Common questions
Will I need planning permission for a shutter in Reading?
An external shutter normally needs planning permission from the local planning authority, while internal shutters behind the glass usually do not. Listed buildings and conservation areas need extra care. We provide the shutter specification for your application.
How quickly can a shutter be fitted in Reading?
Shutters are made to measure after the survey and any planning approval, then most single shopfronts are fitted in a day. We confirm a realistic programme in writing with your quote rather than promising a date we cannot keep.
Is it cheaper to convert or replace?
Converting a sound shutter is usually cheaper than a new electric shutter. If the curtain or barrel is worn, replacement can be better value long term.
Can a push-up shutter be motorised?
Often, yes, but the springs must be dealt with by a trained technician first. We confirm at survey.