Solid steel shop shutters in Arbroath: what to expect
Shops in the DD11 postcode district range from convenience stores to takeaways, salons and specialist retailers. We tailor solid steel shop shutters to the stock you hold and the hours you open, and say plainly where a different option would serve you better.
Each shutter is made to measure before the fitting visit, so most single shopfronts in Arbroath are fitted in one day once planning and landlord consent are in place. We plan the visit around your trading hours where we can.
Nearby, we also cover Carnoustie, Montrose and Forfar; Arbroath is about 16 miles from Dundee.

What's included
Full-cover galvanised steel laths for maximum privacy and weather protection.
- Finished galvanised, or powder coated to a RAL colour
- Manual (crank or push-up) or electric operation
- Wind locks and end stops to keep the curtain in its guides
- Face-fit, under-fascia or concealed behind the fascia
| Typical box | 205–300 mm depending on drop |
|---|---|
| Operation | Manual or electric |
| Finish | Galvanised or powder coated (RAL) |
More detail on our solid steel shop shutters page.
What solid steel shop shutters cost in Arbroath
| Option | Guide price ex VAT | Inc VAT |
|---|---|---|
| Solid steel, electric, box hidden behind the fascia | £1,995–£3,495 | £2,394–£4,194 |
| Solid steel, electric, face-fit box Recommended | £1,495–£2,695 | £1,794–£3,234 |
| Solid steel, manual | £895–£1,495 | £1,074–£1,794 |
Guide prices, supply and fit, for a typical shopfront about 3 m × 2.5 m unless stated. Your fixed price is confirmed in writing after a free survey, before any work starts.
Planning rules for shutters in Arbroath
Scottish councils normally require planning permission before an external roller shutter is fitted to a shopfront. A shutter fitted inside, behind the glazing, is generally outside planning control.
If the building is listed, listed building consent is needed too, and Historic Environment Scotland's guidance is a useful reference; in conservation areas, councils often prefer internal or open-mesh designs.
What happens next
Send your details
Use the form, freephone or chat to tell us what you need. A short description and a photo help us bring the right information to the survey.
Survey on site
A surveyor measures up, photographs the frontage and checks headroom, side room and the ground the shutter closes onto.
Agree the price
Your written quote sets out exactly what is included. Payment terms on installations are 50% deposit, 40% on the first day of fitting and 10% on completion.
Made, fitted, explained
The shutter is made to measure and fitted, then we show you how to use it and the manual override, and leave the paperwork.
Common questions
How quickly can a shutter be fitted in Arbroath?
Shutters are made to measure after the survey and any planning approval, then most single shopfronts are fitted in a day. We confirm a realistic programme in writing with your quote rather than promising a date we cannot keep.
Will I need planning permission for a shutter in Arbroath?
An external shutter normally needs planning permission from the council planning department, while internal shutters behind the glass usually do not. Listed buildings and conservation areas need extra care. We provide the shutter specification for your application.
Can a solid shutter be painted to match my shopfront?
Yes. The laths, guides and box can be powder coated to a RAL colour at the factory, which lasts far longer than painting on site. Colour-matching to the shopfront frame is often welcomed by planning officers.
Will a solid shutter rust?
Galvanised steel resists corrosion well, and powder coating adds a further barrier. Coastal sites and damaged coatings need more attention, which is why we suggest an annual service.