Shopfronts in Montrose and solid steel shop shutters
Every opening is measured on site. In Montrose, as anywhere, we look at headroom above the glazing, side room for guide rails, the ground the bottom rail will close onto and any outward-opening doors, because each of these changes how the shutter is specified and fixed.
Before quoting in Montrose, we confirm who owns the frontage, whether the lease restricts external alterations and whether the building is listed or in a conservation area. Sorting that early avoids paying for something that cannot be fitted.
Our coverage around Montrose takes in Arbroath, Forfar, Carnoustie and the wider Dundee & Angus area.

What our solid steel shop shutters include
Full-cover galvanised steel laths for maximum privacy and weather protection.
- Manual (crank or push-up) or electric operation
- Manual override fitted to electric shutters
- Face-fit, under-fascia or concealed behind the fascia
- Wind locks and end stops to keep the curtain in its guides
| Finish | Galvanised or powder coated (RAL) |
|---|---|
| Typical box | 205–300 mm depending on drop |
| Operation | Manual or electric |
More detail on our solid steel shop shutters page.
Prices for solid steel shop shutters in Montrose
| Option | Guide price ex VAT | Inc VAT |
|---|---|---|
| Solid steel, electric, box hidden behind the fascia | £1,995–£3,495 | £2,394–£4,194 |
| Solid steel, electric, face-fit box Recommended | £1,495–£2,695 | £1,794–£3,234 |
| Solid steel, manual | £895–£1,495 | £1,074–£1,794 |
Guide prices, supply and fit, for a typical shopfront about 3 m × 2.5 m unless stated. Your fixed price is confirmed in writing after a free survey, before any work starts.
Do shutters in Montrose need planning permission?
Scottish councils normally require planning permission before an external roller shutter is fitted to a shopfront. A shutter fitted inside, behind the glazing, is generally outside planning control.
If the building is listed, listed building consent is needed too, and Historic Environment Scotland's guidance is a useful reference; in conservation areas, councils often prefer internal or open-mesh designs.
Four steps to a new shutter
Get in touch
Give us the postcode and what you are after. We confirm a survey slot and anything we need beforehand.
Free survey
We measure the opening, check the fascia, fixings and power, and talk through planning and landlord consent.
Quote in writing
We send the specification and a fixed price in writing, with a deposit only on acceptance.
Made, fitted, explained
The shutter is made to measure and fitted, then we show you how to use it and the manual override, and leave the paperwork.
Questions from shop owners in Montrose
How quickly can a shutter be fitted in Montrose?
Shutters are made to measure after the survey and any planning approval, then most single shopfronts are fitted in a day. We confirm a realistic programme in writing with your quote rather than promising a date we cannot keep.
Will I need planning permission for a shutter in Montrose?
An external shutter normally needs planning permission from the council planning department, while internal shutters behind the glass usually do not. Listed buildings and conservation areas need extra care. We provide the shutter specification for your application.
Can a solid shutter be painted to match my shopfront?
Yes. The laths, guides and box can be powder coated to a RAL colour at the factory, which lasts far longer than painting on site. Colour-matching to the shopfront frame is often welcomed by planning officers.
How long does fitting take?
Most single shopfront shutters are fitted in a day once made. Larger openings, concealed boxes or electrical work can add time, and we confirm the plan in writing after the survey.