Electric shop shutters for shops in Hammersmith
Where a shop opens onto a busy pavement, safety during fitting and in daily use matters. We cordon the work area, fix guides into sound masonry or steel, and set electric controls so the person operating the shutter can see the curtain while it moves.
If your shop in Hammersmith already has a shutter, we will tell you honestly whether a repair, a new motor, a conversion or a full replacement makes most sense before you spend anything.
We also cover Fulham, Kensington and Chelsea, and the rest of Greater London.

About our electric shop shutters
Motorised shutters with key switch, remote or timer, and a manual override.
- Electrics to BS 7671 by qualified electricians
- Key switch, remote, timer or hold-to-run controls
- Tubular or external motors sized to the curtain weight
- Works with solid, perforated, vision and grille curtains
| Override | Crank, hand chain or release |
|---|---|
| Power | Fused spur near the box |
| Safety | To BS EN 12453 where required |
More detail on our electric shop shutters page.
Guide prices
| Option | Guide price ex VAT | Inc VAT |
|---|---|---|
| Electric solid shutter, box hidden behind the fascia | £1,995–£3,495 | £2,394–£4,194 |
| Electric solid shutter, face-fit box Recommended | £1,495–£2,695 | £1,794–£3,234 |
| Converting an existing manual shutter to electric | £595–£1,195 | £714–£1,434 |
Guide prices, supply and fit, for a typical shopfront about 3 m × 2.5 m unless stated. Your fixed price is confirmed in writing after a free survey, before any work starts.
Do shutters in Hammersmith need planning permission?
In England, an external shutter on a shopfront is normally treated as development that needs planning permission from your local planning authority, because it changes how the building looks. There is no permitted development right for shop shutters. Internal shutters fitted behind the glass usually sit outside planning control.
Listed buildings need listed building consent for works affecting their character, inside or out, and conservation areas bring closer scrutiny of the design. Many councils publish a shopfront design guide that prefers perforated, punched or internal shutters with the box hidden behind the fascia.
From enquiry to handover
Send your details
Use the form, freephone or chat to tell us what you need. A short description and a photo help us bring the right information to the survey.
Free survey
We measure the opening, check the fascia, fixings and power, and talk through planning and landlord consent.
Agree the price
Your written quote sets out exactly what is included. Payment terms on installations are 50% deposit, 40% on the first day of fitting and 10% on completion.
Fit and test
After fitting we test every function with you and confirm servicing recommendations in writing.
Electric shop shutters in Hammersmith: questions
How quickly can a shutter be fitted in Hammersmith?
Shutters are made to measure after the survey and any planning approval, then most single shopfronts are fitted in a day. We confirm a realistic programme in writing with your quote rather than promising a date we cannot keep.
Will I need planning permission for a shutter in Hammersmith?
An external shutter normally needs planning permission from the local planning authority, while internal shutters behind the glass usually do not. Listed buildings and conservation areas need extra care. We provide the shutter specification for your application.
Does an electric shutter need a separate power supply?
It needs a suitable fused supply near the shutter box. If one is not there, our electrician installs it to BS 7671 as part of the job and we include it in the written quote.
How noisy is an electric shutter?
Tubular motors are fairly quiet; larger external motors hum slightly more. Insulated aluminium laths run quieter than single-skin steel.